Guail Contracting and Real Estate Investment Establishment

Dream Tower 1

Dream Tower 1 is a modern architectural masterpiece located in the heart of the capital, Sana'a. Featuring a sustainable and intelligent architectural design that reflects technological advancements and concern for the environment, the tower includes luxurious residential apartments and villas, as well as green spaces and balconies overlooking the capital's breathtaking view. The tower was developed using the latest construction technologies to ensure safety and high quality. The tower also features a security and safety system, a fire-extinguishing system, and smart facilities to ensure efficient use of resources.

Yemen - Sana'a - Al-Khamsin - Beit Bos - next to City Max

2025-04-03

content.videos

Apartments

Apartment A

Northwest Total area of ​​the apartment: 237 m²

Apartment B

Southwest facing, total apartment area 255 m²

Apartment C

Southeast facing apartment. Total area: 254 m²

Apartment D

Southeast facing apartment. Total area: 252 m²

Project Execution Phases

Phase 1: Planning and Design

2025-03-15 - 2025-03-12

This phase includes developing precise engineering and architectural designs for the tower, as well as preparing economic and engineering feasibility studies. During this phase, a 3D model of the building is created using modern software to ensure clarity of details. It also includes comprehensive design reviews by architects, environmental experts, and electrical and mechanical engineers. Official applications are submitted to obtain the necessary licenses from the relevant local authorities to ensure compliance with laws and specifications.

Phase 2: Excavation and Foundations

2024-03-07 - 2024-03-11

During this phase, the site is excavated to prepare deep foundations that will ensure the tower's stability, even in the event of earthquakes or soil shifts. Work includes the installation of the main concrete columns and footings. Advanced excavation equipment is used to ensure efficiency and precision. Periodic soil tests are also conducted to ensure the stability of the foundations and the strength of the concrete. This phase also focuses on waterproofing the foundations to protect them from future water leaks.

profileImage

Guail Contracting and Real Estate Investment Establishment